If you run a specialized construction SME in Québec (electrical, building mechanics, roofing, masonry and many other trades), you'll cross paths with the BSDQ sooner or later. Plenty of contractors confuse it with SEAO, when in fact the two govern two very different stages of the same project.

What the BSDQ is

The BSDQ, short for Bureau des soumissions déposées du Québec (Québec bid depository), is a private non-profit organization created nearly 60 years ago by construction contractors. It was set up through an agreement among three industry organizations: the Association de la construction du Québec (ACQ), the Corporation des maîtres électriciens du Québec (CMEQ) and the Corporation des maîtres mécaniciens en tuyauterie du Québec (CMMTQ).

Its role is to govern how bids are transmitted in construction, to keep competition healthy and fair. The courts have repeatedly recognized its Code de soumission (bidding code) as a "collective contract" serving the public interest.

Info

Where the BSDQ sits. In a construction project, the call for tenders already governs the relationship between the general contractor and the buyer. The BSDQ governs the next tier down: the bids that specialized contractors (subcontractors) send to general contractors.

BSDQ or SEAO: don't confuse the two tiers

This is the most common mix-up, and clearing it up saves you time.

SEAO is the government's electronic tendering system. It governs the relationship between a public body and those competing for its contract (a general contractor, or a direct supplier).

The BSDQ, on the other hand, is a private system specific to the construction industry. It governs the relationship between specialized contractors and the general contractor, whether the project is public or private.

On a public worksite, the two coexist: the general contractor wins the contract through the public call for tenders (on SEAO), then receives bids from its specialized subcontractors through the BSDQ. They're two different doors, at two different levels of the same project.

One important detail: since electronic transmission was adopted, bids addressed directly to the buyer are excluded from the BSDQ Code. The BSDQ covers bids between contractors, not the final bid sent to the buyer.

Which trades are covered

The BSDQ doesn't apply to every trade, or everywhere in the same way. The specialties subject to the Code include electrical work and building mechanics (plumbing, heating, ventilation, air conditioning), along with several construction specialties such as reinforcing and structural steel, roofing, masonry, ornamental metals, metal cladding, thermal insulation and interior systems.

The specialties that actually apply vary by region. The BSDQ provides a tool, the Boussole, that lets you check, by region, which specialties are subject to the Code and which filing guides apply. Check your situation there before you bid.

How it works: the Code de soumission and the TES

Everything runs through the Code de soumission (bidding code), the full set of BSDQ rules, and through the TES (Transmission Électronique des Soumissions, electronic bid transmission), the online platform that became mandatory on February 1, 2013 (it replaced the old sealed-envelope filing).

The key rules to know:

  • Registration is mandatory on both sides. To transmit a bid or take possession of one, both the subcontractor and the general contractor must be registered with the BSDQ. An unregistered contractor can neither submit nor receive.
  • You choose your recipients. The subcontractor decides which general contractors to send its bid to, and can even offer different prices from one general contractor to the next.
  • No negotiation. The system prohibits any back-and-forth of offers and counter-offers. The price filed is firm, which pushes everyone to give their best price from the start. Prices stay valid for a period set in advance.
  • Security above $100,000. Any bid equal to or greater than $100,000 must come with security, in the form of a bid security or a bank transfer equal to 10% of the bid amount.
  • The right to the contract. If a bid comes with security and is the lowest compliant one, it holds a "right to the contract". If no security accompanies the bids, the general contractor can award the contract to any compliant tenderer.

The fees

Joining the BSDQ involves fees. For a specialized contractor: an annual membership fee, bid filing fees, withdrawal fees, and a service contribution once a contract is won. For a general contractor, the only recurring fee is the annual membership. The exact amounts are published on the BSDQ's pricing page; check them at the source, since they change over time.

What it means for your SME

If you're a subcontractor in a specialty subject to the Code, the BSDQ isn't an optional formality: it's the channel through which you reach general contractors on major projects, including public worksites. Three useful habits:

  1. First check whether your specialty and region are covered, using the BSDQ's Boussole tool. That's a first condition. Going through the BSDQ then applies when the project owner requires it in the documents, or when the covered work meets four conditions: it's carried out in Québec, more than one contractor is invited to bid, the documents allow comparable bids, and the bid amount is at or above $20,000.
  2. Register early. Registration and getting comfortable with the TES happen ahead of time, not the day before an important filing.
  3. Plan for the security. As soon as a bid reaches $100,000, budget for the bid security or the 10% transfer. As with public contracts, the ability to provide security quickly often separates the SMEs that can go after large lots from those that hit a ceiling.

The BSDQ (the subcontractor tier) and SEAO (the public tier) are the two entry points to public construction contracts. A construction SME has every reason to master both, because they govern two different moments of the same project.

Methodology and sources

This article draws on the BSDQ's official sources (the Découvrir, S'engager and Code de soumission sections, bsdq.org, consulted on June 4, 2026). Since the BSDQ is a private organization whose rules evolve through agreements, always verify the exact conditions, the specialties covered in your region and the current fees directly on its website before you bid.

Frequently asked questions

Sources

  • Bureau des soumissions déposées du Québec (BSDQ), "Découvrir", "S'engager" and "Code de soumission" sections (preamble, security), bsdq.org, consulted on June 4, 2026.
  • BSDQ Code de soumission: electronic bid transmission (TES) mandatory since February 1, 2013; security required for bids of $100,000 or more.

Adjudica

Bidding on a tender right now? The match report shows who usually bids with this buyer, how close comparable contracts were decided, and who else bids in this category. $490 plus taxes, delivered within one business day.

See the match report

No open notice right now? The assessment covers your last 18 months: $150 CAD + taxes, credited toward your first match report.

The public-procurement numbers, with every analysis

One analysis published, one email. No schedule, no filler.

What's your biggest challenge right now?